Tuesday, January 27, 2009
I spent yesterday and today finishing the flooring for the 'Library". The library will include a magazine rack and books PLUS a composting toilet, a propane shower and a wash basin. Went to Lowe's and purchased the framing (2x4), wall sheathing (T-111) and roof sheathing (OSB). I have already re-finished the internal door (taken from a old farm house) and back door from Lowe's.
0 Comments:
Post a Comment
<< Home